SCELBI PROM PCB Update

diode in copper

diode in copper (crop of image by Jack Rubin)

Last Friday, I thought I froze the layout for the final time. I took a few looks at it, checking for correctness over the last week, finding nothing to fix or improve upon. Today, I planned on kicking off the build, after doing a final check. However, during this “last” check, I noticed that the diode symbols were missing on the front copper layer. The are not obvious, as they are obscured by the actual diodes. I’ll have to add them in, recheck the layout, regenerate the Gerbers and do some final checking (yet again). Hopefully the PCB will be ready to order by Monday. After that, it will take about four weeks, plus or minus, to be manufactured, shipped, built and tested.